J-Field Phytoremediation Program
Dialysis Sampler Evaluation of Rhizosphere Phytoremediation Processes in the Poplar Grove at J-Field (2001)
(2 MB)
J-Field Phytoremediation Project Field Events and Activities Through July 31, 2000
Aberdeen Proving Ground, Edgewood, Maryland
August 31, 2000
Work Plan: Performance Evaluation of Phytoremediation and MNA Interaction, J-Field Poplar Grove (2000)
(728 KB)
Work Plan for Work Assignment No. 0-034, J-Field Phytoremediation (1999)
(468 KB)
Phytoremediation Study Final Report (1999)
(3 MB)
Work Plan for Fall Sampling Period, J-Field Phytoremediation Study (1998)
(433 KB)
Work Plan for the Mid-Growing Sampling Period, J-Field Phytoremediation Study (1998)
(426 KB)
J-Field Phytoremediation Groundwater Well and Lysimeter Monitoring Report (1997)
(24 MB)
J-Field Phytoremediation Well and Lysimeter Installation Report (1997)
(3 MB)
J-Field Phytoremediation Well and Lysimeter Installation and Monitoring Report (1996)
(2 MB)
Tree Survey in Support of Phytoremediation Monitoring at J-Field (1996)
(1 MB)
Quality Assurance Work Plan for the J-Field Phytoremediation Study and Pooles Island Geophysical and Ecological Assessments, Aberdeen Proving Ground (1996)
(2 MB)
Home
|
Introduction
|
Documents
|
Photos
|
GIS
|
Comments/Questions
|
Credits
|
Disclaimer
Last Modified: 05/14/2002 02:23:35 PM | OPSEC Control Number #4 077-A-4