|  |
An online public information and involvement resource
Northeast Reliability Interconnect EIS Documents
Documents related to the Northeast Reliability Interconnect EIS.
Some of the following documents are in PDF format, which requires the free Adobe Acrobat Reader.
Amendment to Presidential Permit Order
Amendment to Presidential Permit Order No. PP-89-1 (245 KB)
Record of Decision
Record of Decision and Floodplain Statement of Findings; Bangor Hydro- Electric Company Northeast Reliability Interconnect (83 KB)
Final EIS Document
Northeast Reliability Interconnect Final EIS (7.9 MB)
Biological Assessment
Biological Assessment for the Northeast Reliability Interconnect (2.4 MB)
Presidential Permit Modification Application
Application of Bangor Hydro-Electric Company for a Presidential Permit Modification (9.2 MB)
Federal Register Notices
Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect. Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 (55 KB)
Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement; Bangor Hydro-Electric Company Federal Register / Vol. 68, No. 211 / Tuesday, November 2, 2004 (60 KB)
Notice of Application To Amend Presidential Permit; Bangor Hydro-Electric Company [Docket No. PP–89–1] Federal Register / Vol. 68, No. 209 / Wednesday, October 29, 2003 (454 KB)
Draft EIS Public Hearing Transcripts
Transcript of Public Hearing on Draft EIS, Baileyville, Maine, Sep. 28, 2005 (40 KB)
Transcript of Public Hearing on Draft EIS, Brewer, Maine, Sep. 29, 2005 (59 KB)
Scoping Meeting Transcripts
Transcript of Public Scoping Meeting, Baileyville, Maine, Nov. 17, 2004 (41 KB)
Transcript of Public Scoping Meeting, Brewer, Maine, Nov. 18, 2004 (46 KB)
State Permit Application for Site Location of Development and Natural Resources Protection Act
Volume 1 through 4
|