J-Field: Index of Documents
Several project documents were prepared during of the J-Field remedial investigation. Included were planning documents (e.g., field sampling plan and quality assurance project plan, feasibility study work plans) detailing objectives and strategy; and documents presenting findings of the remedial investigation/feasibility study; and Records of Decision (ROD) documenting selected remedial actions. The following are a few select documents relating to the J-Field Study Area; other documents will be added at a future date.
Record of Decision, Final Remedial Action at the Toxic Burning Pits Area (2001) (4 MB)
Remedial Investigation, Vol. 3: Ecological Risk Assessment, Part B Main Text (2000) (3 MB)
Remedial Investigation, Vol. 3: Ecological Risk Assessment, Part A Summary (2000) (376 KB)
Remedial Investigation, Vol. 1: Remedial Investigation Results (1998) (6 MB)
Potential Health Impacts from Range Fires at APG (1998) (18 MB)
A Conservative Evaluation of the Transport of TCE from the Confined Aquifer beneath J-Field, APG, Maryland, to a Hypothetical Receptor (1998) (2 MB)
An Optimized Groundwater Extraction System for the Toxic Burning Pits Area of J-Field (1996) (3 MB)
Focused Feasibility Study for Surface Soil at the Main Pits and Pushout Area, J-Field Toxic Burning Pits Area (1996) (16 MB)
Work Plan for Focused Feasibility Study of the Toxic Burning Pits at J-Field (1995) (4 MB)
Remedial Investigation Work Plan for J-Field (1995) (9 MB)
Phase II Environmental Geophysics at J-Field (1995) (7 MB)
Work Plan for Conducting an Ecological Risk Assessment at J-Field (1995) (8 MB)
Environmental Geophysics at J-Field (1994) (4 MB)
- A Conservative Evaluation of the Transport of TCE from the Confined Aquifer beneath J-Field, Aberdeen Proving Ground, Maryland, to a Hypothetical Receptor
- TABLE: Summary of Field Investigations at J-Field
|