Costs for Disposal of NOW and NORM

Overview
  • Some NOW and NORM wastes are disposed of onsite but a large volume of waste is sent to offsite commercial disposal facilities


  • There are many alternatives for disposing of NOW but relatively few for disposing of NORM wastes


  • Offsite disposal costs vary significantly for NOW and NORM


  • Cavern disposal costs for NOW are comparable to or less expensive than the costs associated with other types of offsite disposal


  • Cavern disposal costs for NORM should be cost-competitive
Oil Field Wastes Sent to Offsite Commercial Disposal Facilities
Type of Waste % Disposed Offsite Vol. Disposed Offsite
Drilling Wastes 28% 102 million bbl
Produced Water <2% <400 million bbl
Associated Wastes 52% 6 million bbl
Source: American Petroleum Institute
NORM most ?
Source: Argonne National Laboratory
Location of Commercial NORM Disposal Companies as of 1998
NORM Disposal Companies
Several disposal companies come to offshore
platforms and perform onsite injection

1997 Disposal Costs for Oily and Solid NOW
Method $/bbl $/yd $/ton
Landspread 5.50 – 57 14 – 40 20 – 95
Landfill/pit 0.50 – 36 6.50 – 37.50 17 – 150
Evaporation 2.50 – 2.75 4.20 – 18.90  
Treat/reuse 0 – 12 12.50 – 28.50 12 – 45
Incineration 10.50 – 38   20 – 100
Injection 8.50 – 11    
Salt cavern 1.95 – 6 50  
Source: Argonne National Laboratory

PDF Costs for Offsite Disposal of Nonhazardous Oil Field Wastes: Salt Caverns versus Other Disposal Methods (134 KB)

Cavern Disposal Costs for NORM Should be Cost-Competitive
  • Most NORM wastes are going to commercial injection facilities that charge more than $100/bbl (see below).


  • Cavern disposal costs for NOW range from $2 – $6/bbl.
    • These costs are competitive with other disposal companies in the same area

  • Current cavern operators have not estimated the incremental cost to handle NORM wastes, but they stand a good chance of being cost-competitive with other forms of NORM disposal once the regulatory agencies issue permits for cavern disposal of NORM.
1998 NORM Disposal Costs – ($/bbl)
NORM Disposal Costs
The onsite injection operations have been used only offshore.

The majority of U.S. NORM waste is going to the commercial injection facility charging $150/bbl.